Most of the priming is done, so it was time to take care of the ceilings. I had broken plaster ceilings throughout and did not want to spend the time pulling them down, so I took a quicker alternative.
2×4 strapping on the current ceiling drilled into the joists and measured to fit the drywall sheets perfectly. With this step done, next it’s time to throw the drywall up!